Hot News
Survey on the design of the Storage Order for the Single Day-Ahead Coupling (SDAC)
Jun 03, 2026
Daily Market - Spot Market Index 11.06.2026
| Price EUR/MWh | Volume MWh | ||
|---|---|---|---|
| BASE LOAD |
110,68
-11,55 % |
96 393,150 | |
| PEAK LOAD |
94,18
-13,14 % |
48 939,400 | |
| OFFPEAK LOAD |
127,19
-10,32 % |
47 453,750 | |
| Volume per month |
1 012 217,975
MWh
|
||
Intra-Day Market Continuous 10.06.2026
| Price EUR/MWh | Volume MWh | ||
|---|---|---|---|
| BASE LOAD |
118,72
+15,02 % |
19 056,1 | |
| PEAK LOAD |
114,89
+47,47 % |
14 523,9 | |
| OFFPEAK LOAD |
124,46
-3,17 % |
4 532,2 | |
| Volume per month |
213 093,8
MWh
|
||
Intraday auction - IDA
| Price EUR/MWh | Volume MWh | ||
|---|---|---|---|
| IDA 1 |
109,39
-14,35 % |
959,4 | |
| IDA 2 |
123,12
+16,75 % |
1 024,4 | |
| IDA 3 |
128,05
+39,93 % |
236,7 | |
| Volume per month |
68 700,2
MWh
|
||
Imbalance Settlement 09.06.2026
| Min CZK/MWh | Max CZK/MWh | |||
|---|---|---|---|---|
| Imbalance Settlement Price | -196,99 | 4 543,96 | ||
| Settlement Price - Counter-Imbalance | -196,99 | 4 543,96 | ||
| Min MWh | Max MWh | |||
| System Imbalance | -46,270 | 47,781 | ||
| Cost of BE | 2 573 238,27 | |||
Intra-Day Market 09.06.2026
| Index OTE | 50,681 | EUR/MWh | |
| Price |
50,680
-1,42 % |
EUR/MWh | |
| Volume | 5 336,100 MWh | ||
| Volume per month | 42 128,6 MWh | ||
System Imbalance 09.06.2026
| System Imbalance | -8 306,5 MWh | ||
| Price for positive balancing amount |
49,41
-1,44 % |
EUR/MWh | |
| Price for negative balancing amount |
52,26
-1,47 % |
EUR/MWh | |
Unused Flexibility Market 09.06.2026
| Positive traded flexibility volume | 4 920,8 MWh | ||
| Negative traded flexibility volume | -10 642,7 MWh | ||
| Positive flexibility marginal price |
0,010
0,00 % |
CZK/MWh | |
| Negative flexibility marginal price |
0,010
0,00 % |
CZK/MWh | |
OTE Information
Intra-Day Market electricity data was published - block contracts
period 80
10.06.2026 19:43:44
Detail
Intra-Day Market electricity data was published - block contracts
period 79
10.06.2026 19:28:42
Detail
© OTE, a.s., 2018